Bob Grube
The Purchasing
Department processes all the requests for materials and items
required for the Production, Shipment and Installation of your
project.
From the beginning of being
awarded your project, the Purchasing Department can begin
purchasing your materials since the project has already been
modeled in Tekla Structures. Tekla Structures is the 3D
detailing program that provides the information on the type of
materials required to build your project.
An advanced bill of materials can
be imported into Fabtrol
(our materials management software program) in advance of your
project being detailed. This allows us to secure the best
possible price for your materials which is a huge advantage
given the unstable market of steel costs. We can have the
material on hand in many cases before the project can be
detailed allowing production to start manufacturing your project
once it has been released from the
Design Department.
These items from the advanced bill
of materials are reserved and set aside so when your project
reaches production it is ready and waiting or on its way well in
advance. We have the ability to know when and where your
materials were purchased, when they are expected to arrive and
if they have been processed and shipped. Through the software
programs we can have the assurance that the materials in your
project get addressed and that they do not get overlooked.
Your satisfaction is most
important to us and it is our goal is to purchase quality
materials for your project as economically as possible so that